Sunday, October 4, 2015

Roll bar / misc

Several miscellaneous items completed today. I first started with assembly of the rollbar with attaching the latch plate.  It calls for match drilling #43 the hole in the latch plate. I did not have a #43 bit so I used a 5/64th bit that is a little smaller. The holes in the roll bar were then enlarged to #30.  The plans call for using a #4-40 tap to tap the hole in the latch plate. I did not have one of those either, so that will have to wait until I order one. T and B helped me rivet the rollbar together.  I then prepared the rollbar braces and the baggage bulkhead.  Trying to get as much ready as I can so once the longerons are complete we can move forward.

I went back through the plans to do some "catchup" of items that I saw needed worked on. Once was the holes for the steps. They were a little tight so I opened them up some to allow the step to insert correctly. I will be waiting until later in the build to permanently install the step.

I had also noticed the hole in the light extensions to be too small for the wiring so I enlarged them some.

I then started on preparing the parts for the vents.  I will assemble them later after the longeron is complete and while working on the side skins.

Time: 3 hrs

Latch plate riveted to rollbar


Riveting roll bar

Completed rollbar

Support frames and bracket

Baggage bulkheads

Step hole tight

Step trial fit

Light opening enlarged

Vents prepared