Saturday, April 18, 2015

R Wing nose ribs / stall warning

T and I worked a short time today attaching the Right wing nose ribs and stub spar. That completed section 15.  We then started working on the the stall warning.

Time: 1.25 hrs.
Right Wing

Stall Warning

Thursday, April 16, 2015

Left and right rib attachment

T helped me today get some good progress on the wings. We started by riveting the left rear spar assembly on the left main ribs. We then proceeded to rivet the nose ribs onto the left spar.  Again it was very important to make sure the right rib was in the correct location. The left stub spar was then attached and the bushings placed in the ribs.

One question came up to how many nutplates should be on the selected ribs as on page 15-02.  The instructions there show 1 nutplate per each of the selected ribs, but in assembling the wing, page 15-04 instructions and figure show more than one nutplate attached per each of those ribs.  An email was sent to vans to clarify before I skin the wings.

We then started assembling the right wing, starting with the riveting of the right main ribs onto the right spar. The right rear spar assembly was then attached.

Time: 3.25 hrs.

Left rear spar assembly

Working on left wing ribs

T riveting nose ribs

Left wing ribs attached

Left wing stub spar

Left inboard nose rib
Left inboard nose rib (outboard side)

W-1208 with attached nutplate

Right wing main ribs and rear spar

Right wing main ribs and rear spar










Wednesday, April 15, 2015

Left spar/ main ribs

Some real assembling began today with riveting of the rib doublers and riveting the main ribs on the left spar. Careful attention was needed to make sure the right rib went to the right location.

Time: 1.25 hr.

Riveting of rib doubler

Main ribs attached to left spar.
Main ribs attached to left spar.
Closeup of inboard main rib of left spar.




Thursday, April 9, 2015

More ribs work

Today was a rib day.  I completed fluting the nose ribs and deburred and fluted the main ribs. Rib doublers were attached.  Hing bracket assembly and Hinge rib were prepared.

Time: 4.75 Hours.

Fluting of ribs

Hardware attached to select nose ribs.

Doublers clecoed to main ribs
Hinge bracket assembly and hinge ribs clecoed together on ribs.





Monday, April 6, 2015

Left nose ribs prep

Deburred, trimmed per plans and started fluting the left nose ribs. 

Time: 1 hr. 

Left nose ribs with tabs cut per plans

Left Nose ribs ready for fluting.


Saturday, April 4, 2015

Debur ribs

Spent a short amount of time I had between other activities to debur a few more nose ribs today.  I can tell this is going to take some time to get all the ribs deburred and fluted.

Time: 0.5


Friday, April 3, 2015

Rear spar assembly

Finished up the rear spar assemblies with the help of T.  Also started deburring the nose ribs.

Time: 1.25 hrs

Flaperon Hinges

Rear Spar
Nose Ribs