Today was a rib day. I completed fluting the nose ribs and deburred and fluted the main ribs. Rib doublers were attached. Hing bracket assembly and Hinge rib were prepared.
Time: 4.75 Hours.
|
Fluting of ribs |
|
Hardware attached to select nose ribs. |
|
Doublers clecoed to main ribs |
|
Hinge bracket assembly and hinge ribs clecoed together on ribs. |
No comments:
Post a Comment