Showing posts with label Section 51A - Placards. Show all posts
Showing posts with label Section 51A - Placards. Show all posts

Tuesday, April 25, 2017

Prop Pitch (G4), Static/pitot tests (G5), Data Plate

Started today with getting the air hose connections ready for the oil purge.  I then continued work on PAP G4 checking prop pitch.  My angles were a little off. One showed about 71.2 and the other about 71.8. So each were adjusted to the recommended 71.4 +/- 0.1. 

I then tested the static and pitot tubes as per PAP G5. A tube and syringe were placed over one static port with modeling clay while the other was covered with tape. Suction was applied and timing was recorded to see how fast the altitude on the EFIS dropped. The max allowed was 100 ft in one minute. Mine recorded between 300-460 seconds for each 100 ft drop. Static PASSED.

The pitot tube was then tested. Again I attached a syringe and tube to the pitot tube and applied pressure and measure time of airspeed drop on EFIS. At first the airspeed dropped quite rapidly so there had to be a leak somewhere. I check the safety wire connection at the aft of pitot tube. I also decided to place safety wire on the pitot tube connections in panel. I then retested. In doing so I also pushed the tubing on the syringe more (which may have been the only issue in the first place). Pressure was applied and timing recorded. The  max allowed is 10 kt per minute. My times were between 380-400 seconds per 10 kt drop. Pitot PASSED.

I also got a call that my data plate was ready to be picked up from the engravers. As per the DAR the only required entries are the Manufacturer, Model, and Serial number so that was lines I had engraved. I returned to the hangar and installed it on the plane as per plans.

I need to have a few other people available to do the oil purge, so as soon as I can get that done I will be able to start the engine and go through the other tests.

Time: 3.5 hrs

Air hose setup for oil purging

Prop pitch check

Prop pitch side 1

Prop pitch side 2

Add caption

Safety wire pitot connection in panel

Data Plate installed






Friday, April 14, 2017

Tool organizing / Wing adjustments

I spend a few hrs organizing tools in preparation for getting them to the hangar. I had to decide what tools went and which stayed at home in my shop. I then received the vinyl N # placard that I ordered at doityourselflettering.com. It is also where I ordered the vinyl numbers for the tail. 

I then loaded some items into my truck that I wanted to get to the hangar and made sure the trailer was all ready to go. 

I had a few moments and still needed to work on trimming the wings to allow space for the seal. I trimmed and filed the lower edges of each wing while it was in the cradle. The upper edge will be easier to do out of the cradle and on saw horses, so I will do that once the plane and trailer are out of the shop.

Time: 2.5 hrs

N # placard

Loaded and ready for transport

Thursday, April 6, 2017

Registration / Placards / G3X / Towbar

REGISTRATION ARRIVED TODAY!!!!  Well, my RV12 is now officially N8697T.  I spent some time today installing some of the placards. I also deemed it time to installed the G3X.  The cowling was then reinstalled. It was a little tricky getting the oil cooler lined up to place the lower cowl but it was accomplished.  I recently received the towbar kit so I spent a short time putting it together.

Time: 2.75 hrs

Installing Placards

Music, 12V outlet placard

Fuel placard

Open canopy placard

G3X installed

Cowling reinstalled

Towbar