Showing posts with label Section 08 - Anti Servo Tabs. Show all posts
Showing posts with label Section 08 - Anti Servo Tabs. Show all posts

Tuesday, March 31, 2015

AST install / trim servo install

Finally!!! I was able to complete the AST assemblies (again) and get them installed.  They lined up great! A tremendous improvement to what the first ones looked like.  I then installed the push rod and trim servo.  I tested both the fully extended position and the fully retracted position and verified all clearances as per plans. Everything looked great.

Time: 3.25 hrs.

AST assemblies installed

Push Rod installed

Trim servo installed

Trim servo




Saturday, March 28, 2015

AST assembly round 2

I picked up the replacement parts for the anti-servo tabs yesterday.  I spent a short time today preparing the parts by deburring and priming.  Hopefully this time everything will come out in alignment.

Time: 1 hr.

Priming of AST parts

AST ready to assemble


Friday, January 16, 2015

Anti-servo Tabs

I was able to complete section 8 today of the Anti Servo Tabs.  Things went fairly smoothly.  All internal parts were primed with NAPA 7220.

Time 3.5 hrs

Skin Clecoed for match drilling

Match Drilling Hinge with guide

Priming with NAPA 7220

Riveting

Completed Anti-servo tabs