Friday, January 27, 2017
Exhaust System
Started and finished exhaust system today. First place and loosely tightened nuts for exhaust pipes. The springs were then used to attach the muffler. The lower cowl was placed to check for clearance of opening. The muffler was positioned so that there was adequate clearance between muffler pipe and cowl. The nuts were then torqued as per plans. The EGT probes were placed with hose clamps and the wire ran as per plans. I then spent a few moments going through and placing zip ties to wires in the engine area to get them cleaned up.
Time: 1.75 hrs
Time: 1.75 hrs