Time: 1.25 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Showing posts with label Section 14 - Rear Spar. Show all posts
Showing posts with label Section 14 - Rear Spar. Show all posts
Friday, April 3, 2015
Rear spar assembly
Finished up the rear spar assemblies with the help of T. Also started deburring the nose ribs.
Time: 1.25 hrs
Time: 1.25 hrs
Thursday, March 26, 2015
Spar Assembly / flaperon hinges
I worked a little back and forth between sections 13 and 14 today. I was able to complete section 13 - Spar assembly. That included drilling and tapping of the tie downs. Also riveting of the attach angles to the spar. As each spar is a little different, close attention was needed to make sure the right holes received the rivets.
The small parts for the flaperon hinges were then deburred and primed. I riveted the flaperon hinge brackets. I started riveting the flaperon hinges, but in so doing I bent the Main Squeeze rod. This was in trying to get the rivets nice and flush. I guess I am stronger than I thought. I will have to be careful and not use such force in the future. (Note: The rod and bolt were ordered.) Now we will have to wait a few days until we can rivet again. I may use the time to prepare wing ribs. We will see.
Time: 4.75 hrs
Subscribe to:
Posts (Atom)