Then it was fuel sealant time. I placed some fuel sealant in the opening of the step. With the help of N and T we sealed and riveted the upper firewall. Fuel sealant was then placed around the perimeter of the firewall as per plans.
Time: 3.25 hrs.
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
No comments:
Post a Comment