Time: 1 hr.
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Tuesday, October 13, 2015
Roll bar paint / start brakes
I painted the second side of the roll bar and braces. While I am waiting on them to dry real well I started on section 27. Started off by cutting the rudder pedal blocks. The then clamped the rudder pedals to the table and placed the brake torque tubes as per plans. The brake cylinders were installed and the pedals were drilled. I was able complete on side today.
Time: 1 hr.
Time: 1 hr.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment