I then started fabricating the return line. The bulkhead fitting was placed. A little awkward to get in place and tightened but doable. The fuel line return aft was fabricated and placed. The nut was torqued to 55 in lbs (50 on the wrench). I then placed the hose pieces and clamps to hold the fuel lines together. I then started fabrication of the return fuel line fwd. I was able to get it through the fuselage and nuts were placed on both ends. The aft end was tightened on the bulkhead fitting. I did not have time today to complete the fwd portion and attach it so that will have to wait for another day.
Time: 2.5