Worked some more on the upper fwd fuselage. Canopy ribs and panel base were prepared and ready to install once fuel line testing is completed. I spent some time covering the rivets on the firewall with fuel sealant as per plans. The clip was then prepared as per plans.
Time: 2 hrs.
|
Canopy Ribs |
|
Panel base |
|
Rivets covered with fuel sealant |
|
Clip |
No comments:
Post a Comment