Wednesday, October 14, 2015

River gun repair / rudder pedals

So the parts for the rivet gun arrived today.  I spent 45 minutes replacing that parts, gun didn't work.  I then thought that I needed to recharge the hydraulics, so I went through the steps and it still didn't work.  I have come to the conclusion that I don't know how to repair a rivet gun.  I am sure there is something simple I have to do, but rather then spend more time repairing a gun when I could be building I decided I would send it in for repairs.  It will take 3-4 weeks to get it back, but in the meantime there are other sections I can be working on.  I would rather hold off riveting the sides until I have the gun as it would be a lot faster then by hand.

I worked on the rudder pedals and brakes some more. The other pedals were drilled and the pedal blocks and brake cylinders installed.

I clecoed the rollbar and braces to the fuselage. I then enlarged the hole in the roll bar attach plates for the canopy light wiring.


Time:  3 hrs

Match drilling pedals

Grease used on brake pedals

Pedal blocks

Roll bar and brace riveted

Hole enlarged for Cockpit light wiring





No comments:

Post a Comment