Wednesday, September 30, 2015

Mid fuselage skeleton / Start Roll Bar

Continued working on the midfuse skeleton. The fuselage latch pin was riveted to the arm rest and then the arm rest was installed on the fuselage.  At this point I need to wait until tools arrive before I can make the longeron and proceed with the side skins.

I decided to start section 24 - Roll bar, so I prepared the roll bar parts and clecoed them together as per plans so the holes could be match drilled. The outside holes were then countersunk as per plans.

Time: 2 hrs

Fuselage pin latch

Mid fuse skeleton

Match drilling roll bar

Countersinking rollbar

Countersinking rollbar





No comments:

Post a Comment