I decided to start section 24 - Roll bar, so I prepared the roll bar parts and clecoed them together as per plans so the holes could be match drilled. The outside holes were then countersunk as per plans.
Time: 2 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
No comments:
Post a Comment