Time: 1.5 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Thursday, September 3, 2015
Step angle bracket / step floor nutplate a
Worked today on the step attach angles. It involved cutting and match drilling the step attach angles and leveling the step to match drill the hole for the step. The angles required priming, so while the primer was setting I moved forward and attached nutplate to the step floor and the baggage bulkhead.
Time: 1.5 hrs
Time: 1.5 hrs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment