Thursday, September 3, 2015

Step angle bracket / step floor nutplate a

 Worked today on the step attach angles. It involved cutting and match drilling the step attach angles and leveling the step to match drill the hole for the step.  The angles required priming, so while the primer was setting I moved forward and attached nutplate to the step floor and the baggage bulkhead.

Time: 1.5 hrs

Match drilling step attach angles.

Match drilling step hole

Priming step attach angles

Nutplates on Step floor

Nutplates on step floor

Nutplates on baggage bulkhead






No comments:

Post a Comment