Monday, September 7, 2015

Step floor / baggage bulkhead.

Had the help of B today.  We riveted the step floor and baggage bulkhead. During these steps part of the autopilot brackets were installed.

Time: 1.25   hrs.

Riveting step floor

Riveting baggage bulkhead

Clecoing autopilot brackets

Auto pilot brackets

Facet pump bracket





No comments:

Post a Comment