The step attach angles were installed along with the bulkhead. Instructions state that the steps can be added at any time during the install, so I have elected to wait until later in the build. Bushings were placed.
Time: 1 hr.
|
Riveting step attach angles |
|
Riveting bulkhead |
|
Interior view after riveting step attach angles. |
No comments:
Post a Comment