Big day today! Went to Vans with some friends to pick up the Avionics and Powerplant kits. While we were there we did the tour. We were hoping they could get a demo flight but the fog kept that from happening.
Upon arrival at home I unloaded the kits and did the fun part, inventorying. It looks like everything was there. I also opened the crate to the engine and had a first look at my Rotax Engine.
Time: 2.75 hrs.
|
Rotax engine unloading |
|
Rotax engine reveal |
No comments:
Post a Comment