Thursday, June 23, 2016

Wheel fairing day 5

I tried in the complete nose fairing. Then started working on the nose leg fairing. The leg fairing was clecoed in place and holes drilled into the leg as per plans. Epoxy was placed around the holes.

Time: 1 hr.

Nose wheel fairing in place.

Nose leg fairing clecoed in place.

Epoxy added.



No comments:

Post a Comment