I went back and installed the spar pin switch. I had to purchase the proper size wrench as I didn't have one that would fit the nuts. Per instructions washer can be added to get the proper spacing for the switch and pin. I ended up adding 5 washers on each side.
I then went back through the plans to see what else could be done that I haven't done yet. I decided to start on the tailcone fiberglass. I spend some time cutting and sanding the fiberglass to the scribe line. It was a dusty mess, but I was able to sit out in the nice cool evening air to do it.
Time: 3.25 hrs
No comments:
Post a Comment