Continued work on the front wheel fairing. Nutplates were attached. A drill template was place and drilled as per plans. The doublers were then added. Nutplates were placed on the nose fork. The lower wheel fairing was then attached.
Time: 2.5 hrs
No comments:
Post a Comment