Wednesday, June 22, 2016

Wheel fairing day 4

Continued work on the front wheel fairing. Nutplates were attached. A drill template was place and drilled as per plans. The doublers were then added. Nutplates were placed on the nose fork. The lower wheel fairing was then attached.

Time: 2.5 hrs
Nutplates attached

Drill template

Doublers attached

Nutplates on nose wheel

Bolt placed

Front lower fairing attached






No comments:

Post a Comment