Time: 3.75 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Saturday, June 11, 2016
Canopy drilling
Well, today was the big day of drilling the canopy. With the help of N. we were able to get it all drilled. We started by drilling the holes in the front and rear. Then match drilling the canopy skirt to the canopy frame. The holes were then match drilled from the canopy skirt to the canopy. N. sat inside to help push against the canopy while the holes were drilled. There was some minor sanding that had to be done to the canopy on the left side to get the proper fit.
Time: 3.75 hrs
Time: 3.75 hrs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment