More work on the wheel fairings. I removed the main wheel fairings and cleaned off the tape that was placed. The nut plates were then placed on the main wheel fairings. The should now be ready to install later down the road.
I continued with the front wheel fairing. The pieces were fitted together with the strip. The strip had to be bent a few times and the halves trimmed some to get the proper fit. Eopxy was then placed as per plans and the strip riveted to place.
Time: 4.75 hrs.
|
Main wheel fairing nutplates. |
|
Main wheel fairings complete |
|
Front fairing clecoed |
|
Front wheel fairing strip epoxy placed. |
No comments:
Post a Comment