Friday, July 29, 2016

Wheel fairings day 6/ paint canopy skirt

Worked on the nose leg fairing again today. The hinge was cut, match drilled and riveted to the nose leg fairing.  I also painted the inside of the canopy skirt.

Time: 2hrs.

Nose leg fairing bracket

Nose leg fairing hinge placed.

Inside of canopy skirt painted



No comments:

Post a Comment