Saturday, July 30, 2016

Attach canopy

Today was time to get back to work on the canopy. The canopy frame was reinstalled. The canopy and canopy skirt was then screwed and riveted into place as per plans.  The was some interference on closing with the left canopy skirt, so I bent it out slightly and it closes better. The canopy latch, blocks, and switch were then installed.  I then masked and taped the are to get it ready for the laying of fiberglass. The foam block was trimmed and then glued to the canopy frame with epoxy.

Time: 5.75 hrs

Canopy frame installed

Screws placed rear canopy

Canopy skirt riveted

Latch block

Canopy micro switch

Guide blocks

Area taped and masked for fiberglass work

Foam block cut and epoxied into place








No comments:

Post a Comment