Time: 2.5 hrs.
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Tuesday, April 4, 2017
Carpet, Sidewalls, Seats
Today was a fun day installing the interior. I started by installing the shoulder harness and carpeting. Then installed the seat belts. The sidewalls were then installed. Boots were placed over the flap handle and control sticks. The seats were then put in place. Of course B and I had to try the seats out. Really starting to look like an airplane now.
Time: 2.5 hrs.
Time: 2.5 hrs.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment