Worked on installing the main gear legs. Started with placing a thin layer of grease on the plates and brackets as per plans. Then installation of the main gear legs began. It was a little tricky getting the bolts in place. S helped me some to get the bolts in places and torqued.
Time: 2.25 hrs
|
Plates and brackets greased |
|
Right gear leg |
|
Left gear leg |
|
View of leg bolts in cabin |
No comments:
Post a Comment