Time: 4.5 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Thursday, December 17, 2015
Fuselage wiring day 3
Was able to get quite a bit accomplished today. I ran the wires and attached the connector for the autopilot pitch servo and spar pin wiring. Wires were then ran to locations as specified in plans. I then started on running the WH-00045 wire bundle. In doing so, I had ran the previous bundle under the brake pedal bar. The antennae wires were ran over the bar. This seemed a little strange to me as I thought maybe the bundle needed to go over also. After looking through the instructions, it wasn't real clear, but some of the figures later in the section show the wire going over the bar. So great! I already had some of the wire ran. In order to correct this I had to remove the brake pedals and place the wires over the bar. Not an easy task, but with the help of N I was able to get it accomplished. The hardest part was keeping the washer in place.
Time: 4.5 hrs
Time: 4.5 hrs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment