We installed the nose gear leg. and fork. I need to finalize torque of the fork, so that will have to wait until next time as we were running out of time today. Also there is a question on when the bolts at the top of the nose leg are installed. I couldn't see with a quick run through of the plans. I will need to research that also. Maybe they get installed with the engine. I will see what I find out. I also need to see if I need to balance the wheels or not. Lot of things to research.
Time: 2.25 hrs.