Worked on drilling the cowl hinges.This required making sure the edges of the cowl lined up well and then holes were drilled using the marked previously made on the hinges.
Time: 1 hr.
![]() |
| Cowl hinges drilled |
![]() |
| Cowl Hinged drilled. |
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.