Time: 4 hrs.
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Saturday, December 10, 2016
Engine wiring / fuel lines
Lots of other projects to do today, but since it was my birthday my family "forced" me to work on my plane. Started with attaching the VA-216, gascolator, fuel return, and fuel pressure lines. I then worked on the wiring which included the ignition, oil pressure, CHT, oil temp, and starter wiring. The manifold pressure hose was placed. I also cut, bent, and installed the drain line.
Time: 4 hrs.
Time: 4 hrs.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment