Friday, December 2, 2016

Hanging engine

Another big milestone day today! Started by re-configuring the clamp block assembly as per plans. Then prepared for engine hanging by attached some straps to the engine mount and the front of the engine. I used my tractor to lift the engine and position it in place. Had a few minutes of help from HVAC guys who were here looking at a problem with one of our house furnaces. They offer to help position engine so I took them up on the offer. After a few minutes the bolts were placed and torqued as per plans. Now the plane is no longer tail heavy. A good milestone accomplished!

Time: 1.5 hrs.

Clamp Block repositioned


Preparing to lift engine

Placing straps for engine lifting

Engine mounted
Engine mounted





No comments:

Post a Comment