This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Wednesday, May 25, 2016
Fuel tank test / latch handle
After waiting over a week for the fuel tank sealant to cure good I pressure tested the tank. As instructed a balloon was placed. I let it set there for a bit to see if it changed. While I was waiting I fabricated the latch handle. I then checked the balloon and it had gone down some. I made a mixture of soap water and sprayed on all the seams. There was one small leak noticed on the UR rear corner. All the other seams seemed to be good.
Time: 1 hr.
Time: 1 hr.