Time: 2 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Thursday, May 5, 2016
Fuel tank cont.
Continued work on the fuel tank. I installed the fuel strainer. The fuel sender wire was bent per plans and the tested. I received a reading of 30 in the up position and 247 in the down position (The plans say approximately 30 in one position and 240 in the other). The fuel sender was temporarily installed to make sure the float is at the proper measurements. The mechanical gauge was installed. The neck flange and the fluid fitting were also installed.
Time: 2 hrs
Time: 2 hrs