Friday, January 30, 2015

Stabilator skeleton

After over a week from not working on the plane it was good to get back to the project. All the stabilator parts we deburred, prepared for priming, and primed.  Both of the stabilator skins were prepared by priming the matting surfaces and deburring edges. The stabilator skeleton was then assembled and the hinges were placed.

Time: 5 hrs.

Priming of Stabilator Skeleton Parts

Priming of the matting surfaces of skin

Matting surfaces of skin primed

Skin ready for attachment to Skeleton

Assembly of Stabilator skeleton

Hinges on stabilator





No comments:

Post a Comment