I wiped down the VS skeleton parts with acetone and then sprayed them with NAPA 7220 primer. While that was drying N. and I started working on the rudder spar and ribs. we were able to get them drilled and deburred.
After dinner we went back to the shop and the primer seemed to be set enough to start riveting. We then placed our FIRST rivet of our RV-12. All five of us (the younger two were already in bed) were able to place a rivet on the hinges that attach to the VS. The first parts of the airplane are not attached.
We had a little time so S. and I worked on getting the VS skeleton put together. I had the first opportunity to remove a rivet while attaching nutplates to the VS spar. We had the nutplate clecoed at one end but must have moved before we riveted, as when I went to place the second rivet the nuteplate was not attached. There was just a rivet in the spar. No problems though, I simply drilled out the rivet and placed a new one. I am sure this won't be the last time I have to drill out a rivet.
Time: 2.5 hrs
No comments:
Post a Comment