I then started section 47 - Spinner & Propeller. The pitot tube was prepared with the pitot block as per plans. This involved making a slight dimple (or drilled indentation) in the pitot tube. The block and pitot tube were then installed. The pitot tubes were then attached with safety wire. I prepared the spinner by trimming and sanding to the time line. The bushing was then placed in the spinner. I used superglue for this step. The spinner plate and hub mount half was then installed. Bolts were torqued as per specified with the propeller.
Time: 3.5 hrs
No comments:
Post a Comment