I placed the heat shield in the lower cowl. This involved creating a template from newspaper and verifying proper placement with exhaust pipes. The shield was then cut to template and attached to cowl. Resin was then placed on the edges.
I then started and finished section 50 - Engine Controls. The throttle and choke cables were installed as per plans. The longer cables going to the right. They were attached to the carburetor as per plans. I then fuse the end of the cables using a flame and drill as instructed with an EAA video. It worked quite well.
Time: 4hrs
 |
| Heat Shield |
 |
| Engine Controls |
 |
| Control Cables |
 |
| Right Carb. |
 |
| Left carb |
 |
| Rigth cables attached |
 |
| Control cables |