Friday, February 10, 2017

Cooling Duct

Worked on the cooling duct today. Started by trimming the cooling duct and interface to the trim line. This took some time. I then attached the oil cooler to the cooling duct. The duct was then tried into place. It was aligned as per plans and then holes drilled and clecoed to the bottom cowl. Once everything looked good the cowl was removed.

Time: 3.25 hrs

Oil Cooler attached to Cooling duct

Cooling duct fitted into place.

Drilled and clecoed
Inside view





No comments:

Post a Comment