Time: 2.5 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Monday, September 5, 2016
Canopy fiberglass 1
Well the dreaded day began today, the fiberglass work. Since this was our first time doing this we didn't know exactly what to expect. I tried to learn as much as I could from watching videos before hand. I used black epoxy dye so that inside the canopy the area would be black. The first piece on each side was a little tricky. The subsequent layers seemed to go on fairly well. I then added peel ply to each side.
Time: 2.5 hrs
Time: 2.5 hrs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment