Weather hasn't been too cooperative to get the plane out of the shop, so I have decided to work ahead on stuff that can be done. I started section 33 by working on the seat floor plates. Nutplates were attached.
I then proceeded with the corrugated baggage bulkhead. The upper and lower were match drilled and then nutplates were added. The parts were then screwed together.
Time: 1 hr
|