Time: 2.75 hrs
This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Saturday, January 16, 2016
More wiring
More wiring work today. Most wires have been ran, so it was time to tidy things up. I installed the wireways near the pedal bar and then went through securing wires with tie wraps. System blocks were installed. The noise filter near the fuel pump was tie wrapped and RTV sealant was place underneath as per plans. I then worked on tie wrapping and installing the left wing electrical bracket and cover plate.
Time: 2.75 hrs
Time: 2.75 hrs
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment