Started today by preparing the flaperon stops and riveting one flaperon stop and pulley assembly to the seat ribs. The other flaperon stop and the flaperon mixer were then riveted to the other seat ribs. During this time also the auto pilot bracket was installed as per plans.
The crotch strap brackets were then prepared and then riveted to the seat ribs.
Time: 2.25 hrs
|
Flaperon stop and pulley bracket attached to seat rib |
|
Flaperon stop, flaperon mixer and autopilot bracket attached to seat rib |
|
Autopilot bracket |
|
Crotch strap bracket |
|
Crotch strap bracket |
|
Seat rib assemblies |
No comments:
Post a Comment