Seat hinges were cut, match drilled and riveted to the seat floors. The left seat floor was then riveted to the left seat assembly. Nutplates were attached and snap bushings added as per plans. The left seat floor support was then riveted.
The right seat floor was clecoed in place on the right seat assembly and will be the next time I get back on the project.
Time: 2 hrs.
|
Match drilling seat hinges. |
|
Seat hinges riveted |
|
Dimpling seat floor |
|
Left seat floor ready for riveting |
|
Nutplates attached to left seat floor |
|
Left seat floor support added |
|
Snap bushings placed |
|
Rigth seat floor and nutplates clecoed |
No comments:
Post a Comment