Wednesday, August 26, 2015

Bulkhead

Lots accomplished today. Started by drilling out the holes in the bulkhead as per plans. The bulkhead flange was then riveted. The stub spar receptacles were fitted to the spar and then riveted in place.  Doublers and control column assemblies were then added to the bulkhead.  Nut plates were added to the bulkhead. The bulkhead was riveted to the sseat ribs and the seat ramp floors were placed.


Time: 3.5 hrs.

Bulkhead flange riveted

Bulkhead doubler riveted

Control column assembly and stub spar receptacle

Lots of nutplates

Bulkhead doubler

Bulkhead assembly riveted to the sear ribs.

Seat Ramps