Thursday, June 25, 2015

Light extension brackets/ wiring

 After a couple weeks of being out of town it was time to get back to the RV12 project.  My wife will be picking up the Fuselage kit from Vans tomorrow so I need to finish as much as I can on the lighting kit today.  The light extensions were drilled for the light brackets and the holes made for the wiring. The light brackets were then attached.  The wiring was completed by adding molex connectors and housings to the wires in the wing and the wires on the light. I will connect them together at a later time.  I will also wait to rivet the light extensions until later as it calls for fuel tank sealant to be used around the edges. I will do it together later when other parts need the sealant also.

Time: 1.75 hrs.

Light extensions drilled and hole made for wiring.

Ligh Bracket attached to light extension

Molex connector attached to wiring.

Molex connector attached to light wiring.




No comments:

Post a Comment