This is a log of the build of a Vans RV-12, kit #120895. This will be my first experience in aircraft construction and I hope to learn a lot along the way.
Wednesday, December 16, 2015
Fuselage wiring day 2
I spent a short time today installing the aux music jack and running the stall warning and wing ground wires
Time: 0.75 hrs.
Time: 0.75 hrs.
Tuesday, December 15, 2015
Fuselage wiring day 1
Wiring fun began today. I started out by running the Com Antennae, Transponder, ADS-B, and phone cables. The plans call for running some wires from the tail section ,but I will wait to do that until after the tail is attached. I installed the CPU fans. The WH-00046 wire harness was then placed and ran through the bulkhead.
Time: 3 hrs.
Time: 3 hrs.
Monday, December 14, 2015
Start section 30 & 31
I was able to get the last few items inventoried and drawers organized. I then started on section 30 - Wing Attachment. Wouldn't you know it, during step 1 of section 30 I broke the tap in the Pin Stopper. I guess I have to order a new tap and pin stopper.
I decided to proceed with section 31 - Fuselage wiring harness. The grommet was modified as per plans and placed in the firewall. I placed the cushion clamp on the FT-60. The wire run conduit was then clamped into place and strings were ran for future running of wire.
It is good to be back working on the project.
Time: 1.5
I decided to proceed with section 31 - Fuselage wiring harness. The grommet was modified as per plans and placed in the firewall. I placed the cushion clamp on the FT-60. The wire run conduit was then clamped into place and strings were ran for future running of wire.
It is good to be back working on the project.
Time: 1.5
Saturday, December 12, 2015
Finish kit inventory continued
T and N helped me quite a bit in inventorying the rest of the finish kit. Takes quite a bit of time to go through all the small parts. The only thing I found missing was the Brake Reservoir. It didn't look like it was checked on the packing list, so was probably overlooked. I will contact Vans to get that sent.
Time: 4.25 hrs
Time: 4.25 hrs
Friday, December 11, 2015
Finish kit inventory
I started taking inventory of the finish kit. Today I removed most of the larger items and found a place for them on my shelves. I will have to work on the smaller items another day.
Time: 1 hr
Time: 1 hr
Thursday, December 10, 2015
Finish kit pickup
Today I picked up the finish kit. In talking with the people at Vans, I also ordered the autopilot servos since they would be easier to install now. I had to make a decision to go with either Garmin or Skyview. I think they are both good systems So what way to go? I decided on Garmin. I have been familiar with other garmin products and working with the demo it seemed to be a little more user friendly to me. So that is the route we will head.
I got the kit home and unloaded into the shop. Now time to do inventory again.
I got the kit home and unloaded into the shop. Now time to do inventory again.
![]() |
| Unloading finish kit |
![]() |
| Unloading finish kit |
Friday, November 20, 2015
Roll bar baggage bulkhead riveted
Spent an hour this morning riveting the roll bar, and baggage bulkhead. I also riveted the map box. At this point I am pretty much at a stand still until I pick up the finish kit in December. I guess I should have ordered it a little earlier, but I didn't think I would make it this far by this point. I am waiting on installing the tail section until later in the build.
Time: 1 hr.
Time: 1 hr.